Mixing of Foamed Bitumen Stabilised Materials
Austroads has released a report that describes the procedure for adding foamed bitumen to a granular material to produce foamed bitumen stabilized material. The method described is applicable to materials with a maximum nominal particle size of 40 mm. The report is available for no fee after logging into the site .
This Summary Last Modified On: 11/13/2017